Update Water Outage
March 06, 2026
The valve work at the Stateline Water tower is complete. The pumps are being turned on and air will been bled from the lines. It may take time for pressure to be restored in all areas of the water system.
March 06, 2026
The valve work at the Stateline Water tower is complete. The pumps are being turned on and air will been bled from the lines. It may take time for pressure to be restored in all areas of the water system.